Our Projects

Triple Pipe Handling Catwalk Machine, Manufacturing and Installation

Triple Pipe Catwalk machine for 100 feet long x 24″pipe, manufacturing and Installation project

Jack up Rig Derrick Inspection & Aux. Installation

Derrick API Category Ill Inspection and Installation of new Monkey Board including drops survey

Drillship Drilling Equipment survey & Removal

Drillship Derrick Drilling Equipment survey and removal which included Crown Block, TDS , Travelling Block, DSC , Wire rope un-reeving

Land Rig Mast Inspection & Refurbishment

Mast & Substructure Category IV Inspection & refurbishment including post contract rig survey

Land Rig survey for Refurbishment & Replacement of Catwalk Machine

Land Rig survey for Refurbishment & Replacement supply of Catwalk Machine on a 2000 HP land rig for Middle East Client,

Crown Block Survey & 5 yearly certification

Drillship Crown Block survey and 5 yearly certification with OEM

Catwalk Design for ONGC land Rig project

Design of Automated pipe handling catwalk machine for ONGC land rig project

3000 HP Land rig Mast Refurbishment work

Remedial work & refurbishment of 3000 HP land Rig Mast for OEM

Pipe Racking Inspection removal and installation

BJ Racker Inspection removal and Installation inside Derrick

Winch and Iron roughneck Foundation Engineering

Jack up Rig floor foundation Engineering for Winch & Iron Roughneck installation